P15-B removal project

Similar to the NSR platforms of British Aerospace, we acted as project managers on behalf of BP for the removal of the P15-B platform. Our scope entailed:

  • pre-qualification of contractors
  • preparation of ITT, evaluation and contract award
  • contract supervision

Scope was the decommissioning, removal and re-use / recycling and disposal of Rijn field P15/B wellhead platform.

 

Platform details

Wellhead platform, part of Rijn field complex

Location :
Block P15, the Netherlands

Topsides weight (2 lifts + conductors) :
950 mT

Jacket (4 legs) :
1200 mT

Mainpiles :
400 mT

Waterdepth :
26 m